Portugal’s first full electric ferry steel cut started this month, and the auspicious event was celebrated in a ceremony held by the shipowner, CMA (Câmara Municipal de Aveiro), the builder, Grupo ETE, and the engineering partner, Vera Navis.
With a challenging operational envelope this new vessel is fully engineered by Vera Navis, from the technical feasibility concept to a fully detailed production info package using a single ShipConstructor integrated model.
Photo: Júlio Teixeira (CM Aveiro), João Pontes (CM Aveiro), Felipe Mello (Navaltagus), Filipe Belga (Vera Navis)